Skip to main content

Commissioning

Backwater lifting station Ecolift

Commissioning of the backwater lifting station Ecolift, exposed installation / floor slab installation Scope of services: - Inspection according to the inspection card - Briefing on the functionality of the system - Explanation of the monthly inspection by the owner-operator - Information on the maintenance obligation for the owner-operator - Concluding an optional maintenance contract with the client (regular maintenance is a prerequisite for the warranty and insurance cover) - Fixing the control unit to the wall - Installing the electrical components on the system - Routing the electrical cables through the cable duct to the control unit and connecting them (max. cable length 5 m) - System is handed over in a safe operational state Requirements on site: - Contact person must be on site - Access to the system and control unit - A hose water connection must be provided nearby - Wastewater discharge is connected - The backwater valve must be clean - Inlet pipes must be flushed - System components, small parts and the operating instructions must be available in full on site - Permanently installed socket on the wall, usually a socket next to the control unit, max. 2 m away from the cable duct opening Note: - The stated price is a net price and therefore not eligible for a discount. - The lifting station must be serviced every six months by a specialist company. - Flat commissioning rate includes a maximum of 1.5 installation hours on site. - Any additional incidental expenses are charged based on the expenses incurred - From the commissioning to the execution of the service, a processing time of 10 working days should be expected.

Item no. 80203

Commissioning Backwater lifting station Ecolift
Commissioning of the backwater lifting station Ecolift, exposed installation / floor slab installation Scope of services: - Inspection according to the inspection card - Briefing on the functionality of the system - Explanation of the monthly inspection by the owner-operator - Information on the maintenance obligation for the owner-operator - Concluding an optional maintenance contract with the client (regular maintenance is a prerequisite for the warranty and insurance cover) - Fixing the control unit to the wall - Installing the electrical components on the system - Routing the electrical cables through the cable duct to the control unit and connecting them (max. cable length 5 m) - System is handed over in a safe operational state Requirements on site: - Contact person must be on site - Access to the system and control unit - A hose water connection must be provided nearby - Wastewater discharge is connected - The backwater valve must be clean - Inlet pipes must be flushed - System components, small parts and the operating instructions must be available in full on site - Permanently installed socket on the wall, usually a socket next to the control unit, max. 2 m away from the cable duct opening Note: - The stated price is a net price and therefore not eligible for a discount. - The lifting station must be serviced every six months by a specialist company. - Flat commissioning rate includes a maximum of 1.5 installation hours on site. - Any additional incidental expenses are charged based on the expenses incurred - From the commissioning to the execution of the service, a processing time of 10 working days should be expected.
  Title Item no.  
  Title Item no.  
  Title Item no.  
  Title Item no.